Stormwater & Sewer
Boenker Sanitary Relief
AFRAM Corporation prepared the contract documents for the Metropolitan St.

01 Project summary
- Construction Cost: $800,000
- Project Fee: $89,168
- Share of Work: 100%
AFRAM Corporation prepared the contract documents for the Metropolitan St. Louis Sewer District (MSD) for the installation of approximately 1,115 feet of 12-inch diameter sanitary sewer pipe to relieve surcharging of the existing section of 10-inch diameter and 8-inch diameter sanitary sewer during wet weather conditions. The project included a design study and submittal of redline plans and construction documents.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.

“Rock Solid Service at the heart of your project”