Stormwater & Sewer
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.


01 Project summary
- Construction Cost: $18,000,000
- AFRAM Project Fee: $212,609
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station. The work included civil sitework, including vibrocompaction, excavation, dewatering, and backfilling; fine grading; paving; drainage improvements; and connections to existing wastewater conveyance facilities. It also covered structural and architectural improvements; process mechanical improvements; installation of electrical, control, and instrumentation systems; HVAC systems; painting and special coating systems; and equipment start-up and testing services. AFRAM was part of the URS construction management team to provide peer reviews for civil and mechanical design, documentation, and constructability review, review of the engineer’s opinion of cost, and implementing a project management information system.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.
Missouri River Wastewater Treatment Plant
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.