Stormwater & Sewer
Missouri River Wastewater Treatment Plant
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.

01 Project summary
- Construction Cost: $65,000,000
- AFRAM Project Fee: $818,112
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St. Louis County, Missouri. AFRAM was part of the team responsible for the development of the conceptual cost estimate based on preliminary site plans and sketches, managed the coordination of meetings with the design team, identified the goals and strategy for each estimating stage, and followed MSD pricing and procedures for equipment and instrumentation. AFRAM also supplied the inspectors that monitored the contractor’s progress of work during its construction.
Work included
- Demolition and new construction of influent pump station
- Construction of Gas Cleaning Chlorination Building
- Construction of three Aeration Basins and removal/construction of new clarifiers
- Loading Dock
- Construction of new Maintenance Building
- Demolition and new construction of site piping and entrance roads
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.