Experience

The record behind the work.

Cost estimating accuracy, material testing, and stormwater and sewer experience from ACOT’s capability statement.

01 Cost estimating accuracy results

Budget cost against bid price.

The following are a few project examples that demonstrate the accuracy of ACOT cost estimating results.

ACOT cost estimating accuracy: budget cost, bid price and percentage differential
#Project descriptionBudget costBid price% differential
1Maximum Detention Addition, St. Louis$8,500,000$8,320,0002.12
2Maximum Security Prison, RI$56,000,000$54,800,0002.14
3East Terminal Runway Expansion “Pkg. A” Lambert Airport$9,000,000$8,700,0003.33
4East Terminal Expansion “Pkg. B” Lambert Airport$46,632,000$45,500,0002.43
5Garage/Roadway, “Pkg. C” Lambert Airport$22,000,000$21,300,0003.18
6Capital Improvement “Pkg. B” Lambert Airport$6,400,000$6,250,0006.26
7Scot Elementary School$10,000,000$9,400,0006.00
8Student Center, University of Missouri$22,156,000$21,300,0003.86
9Elevator Upgrade, St. Louis Housing$3,200,000$3,125,0002.34
10Harris-Stowe College Library$2,600,000$2,490,0004.23
11Skilled Nurses Facilities, Farmington$6,500,000$6,250,0003.85
12Misc. Building Improvements, St. Louis$1,200,000$1,089,0009.25
13Benton/Stadler Hall Renovation Phase 1$1,800,000$1,790,0000.56
14Addition/Renovation of 12 Libraries for the City of St. Louis$24,000,000Preconstruction 
15New St. Louis Justice Center$60,521,000Schematic Phase only 
16Renovation of 30 Fire Stations, City of St. Louis$12,000,000Design 
17Benton/Stadler Hall Renovation Phase 2$18,200,000$17,900,0001.65
18Ebubu-Oneh Satellite Town Project$1.5 BillionProgramming 

02 Material testing services

Concrete, soil, asphalt & aggregate.

Surveying, GIS & Mapping

Field

  • Slump and air content testing; preparation of strength specimens
  • Aggregate sampling
  • Batch plant test control: verify and adjust batch weights
  • Coring
  • Swiss Hammer
  • Windsor Probe

Laboratory

  • Comprehensive strength testing of cylinders, beams, cubes and cores, all sizes
  • Flexural strength testing of beams, standard sizes
  • Masonry: individual blocks and prisms
  • Aggregates: Los Angeles Abrasion, freeze-thaw, gradation, absorption, specific gravity
  • Mix designs
Field material testing on site

03 Stormwater & sewer experience work sheet

Treatment plants, pump stations and relief sewers.

Work carried out by AFRAM Corporation, as presented in the ACOT capability statement, for the Metropolitan St. Louis Sewer District (MSD), the City of Fenton and the City of Memphis.

Coldwater Creek Treatment Plant, North St. Louis County, Missouri Coldwater Creek Treatment Plant, North St. Louis County, Missouri

Coldwater Creek Treatment Plant

North St. Louis County, Missouri

AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.

Project details

Creve Coeur Pump Station L-52, Saint Louis, Missouri Creve Coeur Pump Station L-52, Saint Louis, Missouri

Creve Coeur Pump Station L-52

Saint Louis, Missouri

AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.

Project details

Study & design

Lemay Pump Station

Metropolitan Sewer District

AFRAM, as a sub-consultant, prepared the preliminary concept schedule and resource-loaded design schedule for two options at the Lemay Wastewater Treatment Pump Station.

Project details

Hurricane Creek Realignment Study, Memphis, Tennessee

Hurricane Creek Realignment Study

Memphis, Tennessee

As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.

Project details

Study & design

Harlem-Baden

Metropolitan St. Louis Sewer District, Saint Louis County, Missouri

For a number of years, severe and frequent flooding problems occurred in the areas of the City of St.

Project details

Paddock Creek Improvements, Metropolitan Sewer District, St. Louis, Missouri

Paddock Creek Improvements

Metropolitan Sewer District, St. Louis, Missouri

Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.

Project details