For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks.

01 Project summary
- Construction Cost: $85,000,000
- Project Fee: $101,300
- Original Design Schedule: Nine (9) months
For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks. The construction utilized boring techniques for some sections to avoid disturbing sensitive utilities and to address poor soil conditions that were unsuitable for normal cut-and-fill procedures. Prior to design, a feasibility study was conducted to analyze the options of installing multiple lift stations with force mains versus constructing extra-deep gravity flow lines.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.