Stormwater & Sewer
Coldwater Creek Bank Stabilization
The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.
01 Project summary
- AFRAM Project Fee: $8,000
The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation. AFRAM provided civil engineering support services as a subconsultant to Geotechnology, including preparation of design drawings, hydrologic and hydraulic analyses, and cost estimating. The hydrologic/hydraulic study specifically evaluated Coldwater Creek’s flow volume and velocity during the September 14, 2008 storm event. Additionally, AFRAM developed cost estimates for the remedial alternatives proposed by other team members.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.