DUNS 079390458CAGE 79F16 (901) 266-1653 info@acot.us.com

Stormwater & Sewer

Coldwater Creek Bank Stabilization

The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.

01 Project summary

  • AFRAM Project Fee: $8,000

The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation. AFRAM provided civil engineering support services as a subconsultant to Geotechnology, including preparation of design drawings, hydrologic and hydraulic analyses, and cost estimating. The hydrologic/hydraulic study specifically evaluated Coldwater Creek’s flow volume and velocity during the September 14, 2008 storm event. Additionally, AFRAM developed cost estimates for the remedial alternatives proposed by other team members.

From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).

Back to all projects

“Rock Solid Service at the heart of your project”

Put us to the test on your next project.