
Stormwater & Sewer
Hurricane Creek Realignment Study
As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.

01 Project summary
- Project Fee: $67,113
- Share of Work: 100%
As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway. Two loading scenarios were evaluated for the reinforced concrete box, and calculations were run on both soil/pavement depths. The City of Memphis also required a study of the Sophia Bayou Drainage area using the EPA’s Storm Water Management Model (SWMM), modeling the existing storm drainage conditions for the 2 to 100-year storm events and recommending improvements, including proposed detention ponds, to alleviate known flooding problems by the most cost efficient method.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.

“Rock Solid Service at the heart of your project”