Stormwater & Sewer
Nettlecreek Brookwood Sanitary Relief Sewer
The project is located in the Grand Glaize Creek Watershed in the City of Town and Country.


01 Project summary
- Construction Cost: $750,000
- Project Fee: $76,700
- Share of Work: 100%
- Original Design Schedule: Six (6) months
The project is located in the Grand Glaize Creek Watershed in the City of Town and Country. The general area extends from Thornhill Drive along Nettlecreek Drive. The project consists of the replacement of approximately 1,500 feet of 10-inch diameter pipe with 18-inch diameter pipe, including 15 house connections and 6 trapped street inlets. The majority of the existing pipe consisted almost entirely of vitrified clay pipe that was in very poor condition. Careful attention to technical coordination was required to address the impact on subsurface utilities as well as landscaped features. AFRAM Corporation coordinated reviews and approvals with all affected regulatory agencies having jurisdiction over the site.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.