DUNS 079390458CAGE 79F16 (901) 266-1653 info@acot.us.com

Projects

Past performance and relevant experience.

Federal courthouses, university buildings, stadium commissioning, housing, airfield and highway work.

Coldwater Creek Treatment Plant project, ACOT Associates Group
Stormwater & Sewer North St. Louis County, Missouri $56,500,000

Coldwater Creek Treatment Plant

AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.

Creve Coeur Pump Station L-52 project, ACOT Associates Group
Stormwater & Sewer Saint Louis, Missouri $18,000,000

Creve Coeur Pump Station L-52

AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.

Grand Glaize Wastewater Treatment Plant project, ACOT Associates Group
Stormwater & Sewer Metropolitan St. Louis Sewer District, Saint Louis County, Missouri $50,000,000

Grand Glaize Wastewater Treatment Plant

This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.

Missouri River Wastewater Treatment Plant project, ACOT Associates Group
Stormwater & Sewer Maryland Heights, Missouri $65,000,000

Missouri River Wastewater Treatment Plant

AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.

Boenker Sanitary Relief project, ACOT Associates Group
Stormwater & Sewer Metropolitan St. Louis Sewer District, Saint Louis, Missouri $800,000

Boenker Sanitary Relief

AFRAM Corporation prepared the contract documents for the Metropolitan St.

Nettlecreek Brookwood Sanitary Relief Sewer project, ACOT Associates Group
Stormwater & Sewer Metropolitan Sewer District, St. Louis, Missouri $750,000

Nettlecreek Brookwood Sanitary Relief Sewer

The project is located in the Grand Glaize Creek Watershed in the City of Town and Country.

Sanitary Relief and Lift Station project, ACOT Associates Group
Stormwater & Sewer City of Fenton $85,000,000

Sanitary Relief and Lift Station

For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks.

Hurricane Creek Realignment Study project, ACOT Associates Group
Stormwater & Sewer Memphis, Tennessee

Hurricane Creek Realignment Study

As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.

Paddock Creek Improvements project, ACOT Associates Group
Stormwater & Sewer Metropolitan Sewer District, St. Louis, Missouri $400,000

Paddock Creek Improvements

Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.

Stormwater & Sewer Metropolitan Sewer District

Lemay Pump Station

AFRAM, as a sub-consultant, prepared the preliminary concept schedule and resource-loaded design schedule for two options at the Lemay Wastewater Treatment Pump Station.

Stormwater & Sewer Metropolitan St. Louis Sewer District, Saint Louis County, Missouri $2,400,000

Harlem-Baden

For a number of years, severe and frequent flooding problems occurred in the areas of the City of St.

Stormwater & Sewer Florissant, Missouri

Coldwater Creek Bank Stabilization

The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.

02 More experience

Cost estimating accuracy, HUD assessments and stormwater work.

See the budget-versus-bid record behind ACOT’s estimating, the HUD properties assessed under the previous company, and the Stormwater & Sewer Experience Work Sheet.

Experience
Creve Coeur Pump Station L-52, Saint Louis, Missouri

“Rock Solid Service at the heart of your project”

Put us to the test on your next project.